Hydroelectric power plant Töging

  • Company/Studio
    Robert Maier Architekten
  • Instagram
  • Lead Designer(s)
    Robert Maier
  • Design Team
    Sebastian Romahn
  • Client
    Verbund Innkraftwerke GmbH
  • Credits
    Rainer Taepper
  • Prize
    Winner in Architecture/Infrastructures & Transportation
  • Project Website

The listed power station site of 1924 was no longer suitable for new technical installations, therefore a new underground building was required. In order to integrate the technology into the landscape, the massive new building was largely integrated into the terrain. Above ground, there is only a headwater and underwater area, which protrude from the slope as individual elements. Delivery and functional areas are located under a concrete disc. The two parts of the building correspond in their architectural design and are connected by a vegetated hillside.

You can create multiple entries, and pay for them at the same time.
Just go to your History, and select multiple entries that you would like to pay for.